Step-by-Step Instructions. Position the gasket so that it is centered on the flange use the bolts as a guide. Lubricate the fasteners well. Be sure to lubricate all load bearing surfaces on the bolts, nuts, and washers. Utilize a calibrated torque device to torque each bolt in a star pattern sequence. Apply the torque in three passes:.
Then wait 4 hours. Complete the installation by performing circular passes until all bolts have acheived the target torque. Not for use in food, drug, cosmetic or medical device manufacturing, processing, or packaging operations.
Resource Library 1. Select the size: For flat face flanges, raised face flanges, and manways: Measure the width of the sealing surface and reference the table below to select the nominal width of GORE Joint Sealant.
Method 1: Compressed Width Factor The gasket area can be calculated by multiplying the length by 1. Method 2: Line Force Gore conducted tests and utilized analytical techniques to determine the amount of force required to compress a unit length of joint sealant. Install the Joint Sealant A. Prepare the Flange Open the flanges a minimum of 15 cm 6". Completely clean the surface to ensure optimal adhesion.
Remove all oil, graphite, and other residue. Apply Joint Sealant Remove the adhesive backing a little at a time, to prevent the adhesive strip from picking up dirt. Complete Joint Sealant Gasket Complete the gasket by overlapping both ends at the starting bolt hole and cut away excess material.
Inititial Skive Cut Unwind about 0. Rain Screens 4. Envelopes 5. Roofs 6. Basements 7. Crawlspaces 8. Structure 9. Joint Rule of Thumb: Sealant should be hourglass-shaped and width should be twice depth shown in diagram. Joints outside this range require special design and installation. Always use the right tool: sealant is not caulk and should never be tooled with a finger saliva interferes with bond.
0コメント